Product Description


materials, it has reasonable mechanical structure, light weight,high strength, strong corrosion resistance, flame retardance, aging resistance and good insulation performance, it can be used in a large range of temperature and the environments of high humidity, heavy acid and or heavy alkali. the service life is 5-6 times of the steel bridge, the installation distance of one ton of FRP cable bridge or tray is 1.5 times of the steel bridge with same specification and same weight.FRP cable bridge can be overhead laying; erected under the beam or floor slab,can be fixed laterally by indoor and outdoor walls, posts, tunnels, cable trench walls., can also be installed in the open air.

2. Light in weight, wide range of sizes.
3. Fast heat dispersion.
4. Strong enough to withstand short circuits. Provides strength, rigidity without additional hardware.
5. Adapts to difficult architectural designs to accommodate changes in direction and elevation of cable runs.
6.Flexible, easy and fast installation. Design allows cable exit or entry at any point.
7. Cables can be secured to clamps or ties.
8.Various hardware accessories available to fix, support and install.
9. Safe smooth edge design to protect cable.
10.Easy for line check and cleaning , easy maintained.

Installation Notice:
Trays shall be supported at a maximum span of 2m by trapeze, wall, floor or channel mounting methods and will not exceed maximum loads as specified by the manufacturer.
Cable Tray systems can be safely employed in places where the temperature ranges between -40°C and +150°C without any change to their characteristics.


Sell various kinds of FRP cable tray according to the drawing and requirement of customers
cost, long life, strong corrosion resistance, easy construction, flexible wiring, standard installation, attractive appearance etc features.
2. Installation way of the cable trays are flexible. They could be laid overhead along with the process pipeline, lifted between floors and girders, installed on inside and outside wall, pillar wall, tunnel wall, furrow bank, also could be installed on the open air upright post or rest pier.
3. The cable trays could be laid horizontally, vertically. They could turn angle, divided according to "T" beam or crossly, could be widened, heightened, changed track.


Notes:
2. Support distance: it should not be more than the support distance and load capacity allowed by load curve.
3. Width of cable trays: some remarkable room should be served when you choosing the cable trays width, in order to add cables in the near future.
4. Laying separately: when electric cables and controlling cables are few, they could be laid in the same cable tray, as long as they are laid separately by clapboard.
5. Fixing cables: when collecting cable trays are laid horizontally, connections among trays should be set on 1/4 of skip
distance, horizontal cables should be fixed every 2 meters, and vertical cables should be fixed every 1.5 meters.
6. cable trays device should have another grounding equipment.

>> Delivery: Within 30 days after the payment was received.
We mainly produce potassium sulfate production equipment,FRP tank production equipment,FRP pultruded products(include FRP Square tube/Rectangular tube /Round tube /Rod / U channel / I beam / Flat / Angle /Decking panel /Plum blossom tube /Ladder carling/Ladder crossgirder ),FRP pipe, FRP tank,FRP septic tank,FRP water tank,FRP grating,Cooling tower,FRP scrubber,Cable tray,FRP cover,FRP flange,FRP rock bolt,FRP handrail and so on,Looking forward to your visit and communication!

A: We are both manufacturer and trading company. We have our own factory for almost seven years, and we have better service of overseas customers. Welcome to send your inquiry!
2. Q: How about the Delivery time?
A: 60days after receiving the deposit based on the MOQ. Normally, 30-35days to finish the order for a 20ft
container. Welcome to ask for the detailed delivery time according to your order quantity!
3. Q: How can you guarantee the product quality?
A: We have the quality control system ISO9001:2015, and it's been followed strictly. We also have the professional QC team, and each our package worker will be in charge of the final inspection according to the QC instruction before packing.
4. Q: What is about the payment terms.
A: Basically, the payment terms are T/T, L/C at sight. Western Union, Alipay.
5. Q: Can you do OEM for me?
A: We accept all OEM orders,just contact us and give me your design,we will offer you a reasonable price ASAP.
HEBEI DONGDING CHEMICAL TRADE CO.,LTD
Hebei Dongding Chemical Trade Co. Ltd (Hereinafter as OPCT company) was founded in 2010, it is a high-tech enterprises that integrated of sale for project consulting, designed and developed, engineering design, materials purchasing, transport of goods, equipment installation, debugging and training in international trade field. Over the years, we has been engaged in the implementation, research and development and innovation of the potassium sulfate equipment, created many successful projects in the field of potassium sulfate equipment and accumulated rich experience;At the same time we constantly improve the potassium sulfate equipment, and achieved with independent intellectual property rights of patent technology. And we constantly strengthen the company`s internal management, strictly control the product quality, also have formed a set of relatively perfect production management, quality management and quality assurance system, obtained ISO9001 certificate. OPCT company had construct projects in various countries around the world, there is a lot of high-quality goods project, such as Saudi Arabia, Brazil, Iran, Indonesia, etc., and get the customer's high praise. In the future, OPCT company will go all the way with our partners, we will create brilliant together.
Company Info
- Company Name: HEBEI DONGDING CHEMICAL TRADE CO.,LTD
- Product/Service: Potassium Sulfate Plant , Frp Pipe , Frp Tank , Frp Grating , Frp Pultrusion Profiles , Water Storage Tank
- Capital (Million US $): 5,000,000RMB
- Year Established: 2010
- Total Annual Sales Volume (Million US $): US$50 Million - US$100 Million
- Export Percentage: 91% - 100%
- Total Annual Purchase Volume (Million US $): Below US$1 Million
- No. of Production Lines: 10
- No. of R&D Staff: 5 -10 People
- No. of QC Staff: Fewer than 5 People
- OEM Services Provided: yes
- Factory Size (Sq.meters): 10,000-30,000 square meters
- Factory Location: East of Weft Three Road,South side of Planning Three Road,Jizhou High Tech Industrial Development Zone(South District) Jizhou District,Hengshui City
- Contact Person: Mr. Bo Zhanxiang
- Tel: +86-318-7971823
Premium Related Products
Other Products